Some Epoxy Applied

The last of my EcoPoxy was just enough to coat the underside of the base and access panel on both sides. The mix ratio was off on the last batch for the panel, so it will need to cure for a few days longer than usual. It can sit aside while I work on the other parts.

A few days ago I drilled holes in the base for the power feed and switches. If a solenoid activated valve is available I’ll add a power drain feature, which will involve two more holes on the perimeter.

Once this layer is cured the next step is to coat the top and install the light cylinders. That won’t be for at least a few days.

Leave a Reply